Client: Atlanta Airlines Terminal Corporation
Location: Atlanta, GA
Completed: Ongoing
Duration: 8 months

ABout the project:

The project scope included the exterior cleaning, painting, and recaulking along the façade of the domestic North, South, and T terminals. Also, included in the project was the replacement of the existing North and South terminal ceiling lights and powder coating of metal ceiling. The renovation was based on phases and all construction was coordinated with the airport to allow for their daily operation. The construction team worked night shifts and extended hours throughout the project to ensure that the project schedule was maintained.