by Gabriel Arronte | Mar 3, 2020 | K-12
The Ethos Classical Charter School project consisted of renovating an existing building that was originally built in the 1950’s. This renovation required a complete update of the building systems and demolition of the existing interior structure. The project...
by Gabriel Arronte | Mar 3, 2020 | Interiors
The project at Southern First Bank consisted of a new office build-out of the first floor at Southern First Bank’s Regional Banking Headquarters. The build-out included high-end finishes and lighting fixtures that bring a luxurious feel to the space. New storefront...
by Gabriel Arronte | Mar 3, 2020 | Healthcare
Phase 1 of the Regenerative Orthopedics project is the start of a two‐phase construction plan. The first phase provided a tenant build-out that would serve as the day to day medical office for the general practitioner. The finished office boasted reception and waiting...
by Gabriel Arronte | Mar 2, 2020 | Healthcare
Phase 2 of the Regenerative Orthopedics project is the conclusion of a two‐phase construction plan. The second phase increases the capabilities of the medical office by adding a fully operable surgery center. The surgery center features two main operating rooms with...
by Gabriel Arronte | Mar 1, 2020 | Healthcare
The project at Piedmont Pulmonary and Sleep Medicine completely overhauled the tenant’s suite. New walls were built to separate the Pulmonary and Sleep Medicine practices into two separate areas within the space. Exam rooms, an X-ray room, and bathrooms were...