by SG Admin | Mar 4, 2020 | Aviation
The project scope included exterior cleaning, painting, and re-caulking along the façade of the domestic North, South, and T terminals. Also included in the project scope was the replacement of the existing North and South terminal ceiling lights and the powder...
by SG Admin | Mar 3, 2020 | Aviation
The renovation of Concourse T consisted of the buildout of 3 restaurants. The restaurants included Bojangles, Coffee Bean & Tea Leaf, and Jamba Juice. The project scope included demolition, millwork, drywall, hard tile, signage, MEPs, and installation of all owner...
by SG Admin | Mar 3, 2020 | Higher Education
This project entailed the mechanical renovation of two adjacent residence halls on the East Campus of Georgia Tech. The existing 2-pipe system was turned into a 4-pipe system to allow simultaneous heating and cooling to different areas of the building. The scope...
by Gabriel Arronte | Mar 3, 2020 | K-12
The Ethos Classical Charter School project consisted of renovating an existing building that was originally built in the 1950’s. This renovation required a complete update of the building systems and demolition of the existing interior structure. The project...
by Gabriel Arronte | Mar 3, 2020 | Interiors
The project at Southern First Bank consisted of a new office build-out of the first floor at Southern First Bank’s Regional Banking Headquarters. The build-out included high-end finishes and lighting fixtures that bring a luxurious feel to the space. New storefront...