The suite construction at Bobby Dodd stadium first started with the full demolition of 6 existing suites. The remaining space was then built-out into two separate spaces, each much larger than the original suites. These 2 suites received all new finishes, millwork, food service and bar equipment, and MEP upgrades. A suspended slab spectator area was also added to the suites, requiring structural steel columns to be added as well.